Ice went out on May 2nd.
Summer 2016 has begun and we have been busy painting, washing all the linens, washing walls and painting.
In motel 4 log siding inside, new bathroom sink, new tub and flooring. We did some much needed repairs to cabin 9 due to water damage. Working on cabin 4, new cabinets in the bathroom and new flooring in the kitchen.
We replaced some of the older boats flooring and purchased another new Crestliner 50 hp and trailer.
Opening up a few of cabins over the winter,so we are putting in a heated water line so that we can be ready for the cold weather. We have a list of things to do, I hope we get them all done before next weekend.
We are excited about the summer, this is the busiest we have ever been. We look forward to seeing everyone. Thank you.
See you soon
Christine, Paul, Jake, Ashley and the boys.